Shipping Instructions · SI
The shipper's instructions to the carrier or forwarder with everything needed to issue the bill of lading. What you write in the SI is what the B/L will say.
- Issued by
- The shipper (exporter), sent to the forwarder or shipping line.
- When it's needed
- Every ocean shipment, before the SI (documentation) cut-off — usually 1–3 days before the vessel sails.
- Transport
- Sea, Rail
What it contains
- Shipper, consignee and notify party exactly as they should appear on the B/L
- Booking number, container and seal numbers
- Description of goods and HS code
- Packages, gross weight, volume and VGM
- Type of B/L required and number of originals, freight prepaid or collect
Practical tips
- Late SI means a late B/L — or a roll-over to the next vessel.
- Use the same description and weights as on the invoice and packing list; mismatches cause customs queries.
Not sure which documents you need?
Send us the route and the goods — we'll list the documents and prepare the transport ones for you.
Other shipping documents
Bill of LadingSea WaybillAir WaybillCMR Consignment NoteRail Consignment Note (CIM, SMGS, CIM/SMGS)Commercial InvoicePacking ListCertificate of OriginExport DeclarationTransit Declaration (T1)Dangerous Goods DeclarationPhytosanitary CertificateShipping documents
General guidance only — requirements depend on the goods, the countries involved and the contract. We check the documents needed for every booking.
Ready to simplify
your ocean
freight?
Compare live rates, gain complete visibility and let Cargo 4S experts manage the execution.